
-
Architects: MW Architects
- Area: 175 m²
- Year: 2015
-
Manufacturers: Reynaers Aluminium, BTC, Mandarin Stone
-
Professionals: KJV, Richard Tant Associates




Architecture and film are interlocked: both unfold narrative ideas through space and time, taking us to real and virtual worlds; both start with the imagination, and then take on their own reality. Films are set in cities, landscapes and buildings where architecture is a visual shorthand, telling us about characters and plot in an instant. Yet a dedicated festival that brings architecture and film together has never before been held in this country.

Following the hugely successful LEAF Awards 2016, which took place in London the LEAF (Leading European Architecture Forum) Awards will once again be returning in September 2017 to the global hub of architecture, London.

Emerging practice NEUBAU has received planning permission to begin construction on Tower Station, a mixed-use residential building located on Fincheley Road in London. Commissioned by County Tower Properties, the ‘pixelated’ building will be located on the site of a former gas station and clock tower, replacing the previous use with a new mechanical clock at the building’s peak, creating a new local landmark that echos the site’s history.
This is the largest commission to date for NEUBAU, founded in 2014 by former OMA architects Brigitta Lenz and Alexander Giarlis.

Peter_Cook.jpg?1494566937&format=webp&width=640&height=580)








Tate Harmer has released plans for a new £8.5million hotel that will provide accommodation for visitors of The Eden Project in Cornwall, England, as the project has received planning approval. The 109-room building will utilize locally-sourced materials and meet high standards of efficiency and sustainability, matching the conservation-minded spirit of the Eden Project.

Merging expert knowledge of timber construction with cutting-edge robotic fabrication technologies we will explore the creative potential of prototyping complex and large-scale timber structures with digital tools resulting in the construction of a roof structure for the temporary foundry building for the Hooke Park Campus.
